Güre is one of Edremit's most beloved summer resort towns. It is known for its thermal springs; its housing stock consists mainly of 1+1 / 2+1 flats built in the 80s-90s and after 2000, set within pine forest. Because they are used as summer homes, these properties stay closed for 6-9 months of the year. That closed period demands a particular renovation and maintenance discipline. Below is the guide we have compiled at Yamanlar Renovation from the work we have carried out in Güre's estate communities.
Why is renovation different in Güre?
While your summer house is closed, there are three main enemies: moisture, freezing and fatigue caused by temperature differences. Güre houses among the pines are cool in summer and damp in winter. In a closed house, the indoor relative humidity can exceed 75-80%; mould appears in the bathroom, kitchen and on north-facing walls. Water residue left in the plumbing can burst a pipe during winter freezing. That is why "summer house renovation" is not merely cosmetic — it is a design for winter continuity.
Suitable materials and application preferences
- Moisture control: Antifungal interior wall paints, silicone-based water-repellent render for the bathroom and kitchen, natural moisture absorbers (zeolite or silica tablets).
- Bathroom / kitchen: Matte porcelain tiles, grout with low mould-forming risk, anti-mould plasterboard on the ceiling.
- Plumbing: We add a drain valve near the main stopcock; we can recommend an automatic freeze-protection mini heater on the combi boiler's inlet/outlet.
- Terraces / balconies: Under the pines, terrace floors grow moss; bamboo composite or a hardwood such as ipe or akoya that takes oil varnish well is recommended.
- Joinery: Double glazing, sealing gaskets and shutters; the shutters act as thermal insurance as much as physical security.
- Garden / surroundings: A washable facade paint resistant to the resin that runs off the pines in the rain.
How does the process work?
- End-of-winter survey: A survey in March-April, before the season opens, makes it possible to see the mould and leaks that formed over the winter concretely.
- Interior repainting: Anti-mould primer + top coat. We do it under protective sheeting without moving the furniture.
- Plumbing maintenance: Valve check, drain outlet test, combi boiler service.
- Terrace maintenance: Annual sanding + two coats of oil varnish. Pine resin is removed with a special cleaner every 2-3 years.
- Kitchen / bathroom renewal: If a full renewal is wanted, demolition takes 1 week, plumbing 1 week, tiling 1 week, finishing 1 week.
- Season-closing package: Shutting off the water, draining the plumbing, placing moisture absorbers, closing the shutters.
Common mistakes
- Closing the valve but not draining the plumbing — if temperatures drop below freezing, a pipe bursts within two nights.
- Using standard paint in the bathroom — if it is not anti-mould, it grows mould within 2 seasons.
- Scratching pine resin off a varnished floor with a dry cloth — it ruins the varnish; use a special solvent.
- Leaving the combi boiler on "low" mode instead of turning it off completely — it makes the gas/electricity bill surprisingly high at the end of winter; only the frost-protection mode is enough.
- Allowing pine branches to fall around the air conditioner's outdoor unit — it strains the fan motor.
What to check during the survey
- Mould marks on the bathroom and kitchen ceilings.
- The flexibility of the joinery gaskets — if hardened, they are replaced.
- The level of darkening of the timber terrace floor and whether any boards are loose.
- Blistering in the paint — it can be a point where rain enters from the roof onto the facade.
- The combi boiler's last service date.
- If the site has an automatic irrigation system, the timing and hose condition.
Factors affecting duration and cost
A pre-season maintenance package for a typical Güre summer house takes 5-10 working days; a comprehensive renovation (kitchen + bathroom + paint + terrace) takes 4-6 weeks. About 30% of the cost goes to plumbing and freeze-protection equipment, 25% to the bathroom / kitchen, and the remainder to paint, timber and general finishing work.
How does Yamanlar Renovation work in Güre?
We have worked in Güre's estate communities for years; we are experienced with liaising with site management, noise hours, weekend material deliveries and similar matters. If you use your summer house remotely, we do the survey with a key and prepare a photo status report. Contact us for a free site survey and a pre-season package.
Frequently Asked Questions
I can't get to my summer house — can I manage the renovation remotely?
Yes. We run the project turnkey; we send photo reports and short videos at every stage. We communicate quickly via WhatsApp for approvals.
Is turning off the water enough in winter?
Not on its own. You must close the valve, open the drain valve to empty the plumbing, and put antifreeze in the siphons.
How is mould prevented in a summer house?
Leave the shutters closed without sealing the windows completely; place moisture absorbers at 2-3 points inside; keep the bathroom door open.
How do you prevent pine trees from ruining the facade paint?
Choosing a washable silicone-based paint for the facade and washing it gently once a year is enough. For resin drops, removing the stain while fresh with a special solvent set is the most practical way.