Ana Sayfa/Blog/How Many Days Does Bathroom Renovation Take? Duration Planning from Our Projects in Edremit
Banyo
08.01.2025
7 dakika okuma
Yamanlar Tadilat

How Many Days Does Bathroom Renovation Take? Duration Planning from Our Projects in Edremit

How long does bathroom renovation take? Detailed duration analysis and planning guide with data from our real projects in Edremit.

banyo
tadilat
süre
edremit
planlama
rehber
Loading...
How Many Days Does Bathroom Renovation Take? Duration Planning from Our Projects in Edremit

Bathroom renovation is one of the topics that homeowners are most curious about. The question "How long will it take?" directly affects the project's success. With data from our 50+ bathroom renovation projects in Edremit, we offer you a realistic duration planning.

Bathroom Renovation Duration Factors

1. Project Scope

Small Renovation (6-8m²):

  • Partial renovation: 7-10 days
  • Complete renovation: 12-15 days

Medium Scale Renovation (8-12m²):

  • Partial renovation: 10-14 days
  • Complete renovation: 15-20 days

Large Renovation (12m²+):

  • Partial renovation: 14-18 days
  • Complete renovation: 20-25 days

2. Special Factors for Edremit Region

Climate Conditions:

  • Drying times may be longer due to high humidity
  • Working hours may be shortened during hot summer months
  • Heating requirements in winter months may require additional time

Material Supply:

  • Quick supply from local suppliers
  • Additional 1-2 days for materials from Istanbul
  • Additional 3-5 days for special orders

Detailed Duration Planning

Week 1: Preparation and Demolition

Days 1-2: Planning and Preparation

  • Photographing current condition
  • Material control
  • Protection measures

Days 3-4: Demolition Work

  • Removing old tiles
  • Plumbing inspection
  • New plumbing planning

Days 5-7: Plumbing Work

  • Water plumbing renewal
  • Electrical installation
  • Ventilation system

Week 2: Main Work

Days 8-10: Plastering and Correction

  • Wall corrections
  • Plastering work
  • Water insulation

Days 11-14: Tile Installation

  • Floor tiles
  • Wall tiles
  • Grouting work

Week 3: Installation and Details

Days 15-17: Sanitary Installation

  • Toilet installation
  • Sink installation
  • Shower cabin/Bathtub

Days 18-20: Electrical and Accessories

  • Mirror installation
  • Lighting
  • Accessory installations

Day 21: Cleaning and Inspection

  • Final cleaning
  • Quality control
  • Customer handover

Speed-Up Tips

  1. Prepare Materials in Advance: Having all materials ready before project start saves 3-5 days
  2. Speed Up Decision Making Process: Make design decisions in advance
  3. Work with a Single Company: Avoid coordination issues
  4. Prefer Simple Designs: Complex details extend duration

Yamanlar Build Duration Guarantee

With our experience in Edremit:

  • Duration Guarantee: Commitment to complete within specified time
  • Daily Reporting: Regular updates on project status
  • Flexible Working: Flexible scheduling for emergencies
  • Quality Focused: We don't compromise quality for speed

Frequently Asked Questions

Q: Does weather affect duration?
A: Yes, especially in humid weather, drying times may be longer. In this case, 2-3 days additional time is planned.

Q: What happens if there's material delay?
A: Thanks to our local supplier network, material delays occur at a rate of only 5%. If they occur, we offer alternative solutions.

Q: Which months are completed fastest?
A: April-May and September-October are the most suitable periods for ideal durations.

Contact us for detailed duration planning and free survey for your bathroom renovation project!